zaterdag 26 november 2016
Choppingtime!!
Vandaag de slijptol gehanteerd
maandag 21 november 2016
framejig
The engine/gearbox bracket is ready
maandag 14 november 2016
On the road
arriving at the 1000 hills party in Eslohe
zondag 13 november 2016
Frame jig
the softailframe is positioned and mounted on the welding mold
zondag 6 november 2016
Frame jig
The frame jig is finally ready
chopping time !
vrijdag 4 november 2016
Two seas
North sea and egean sea
Nieuwere posts
Oudere posts
Homepage
Abonneren op:
Posts (Atom)